TESTING – ADJUSTING – BALANCING / TAB

Appropriate to international standards in air and water lines;

  • Testing

  • Adjusting

  • Balancing

So that;

  • Building comfort conditions are provided.

  • Operation maintenance costs are reduced.

  • Possible manufacturing defects are avoided.

  • Satisfied building users.

DUCTWORK AIR LEAKAGE

BUILDING FACADE / SHELL

INDOOR AIR QUALITY

SMOKE EXTRACTION

STAIR PRESSURIZATION

BUILDING PRESSURIZATION

DUCTWORK AIR LEAKAGE

Ventilation ducts should bring the air to the target with minimum leakage and transmission loss in the lines according to the project design.

Therefore, in ductwork air leakage tests;

  • Channel function

  • Location where the channel flows

  • Channel surface area
  • Operating pressure

Should be considered. Tests;

  • SMACNA

  • EUROVENT and related standards.

BUILDING FACADE / SHELL

  • Architectural facade is tested by ASTM, BS, DIN, EN standards.

  • Heat bridge presence and insulation quality are examined.

  • Impermeability is tested by thermal imaging and thermal insulation.

INDOOR AIR QUALITY

  • High user comfort

  • Healthy indoor environments

  • CO₂, VOC and similar unwanted gas output is monitored and taken under control.

SMOKE EXTRACTION

Natural and mechanical removal systems are checked. Smoke removal mechanism is controlled in critical situation such as fire. Transactions are carried out by NFPA, ISO, EN standards.

STAIR PRESSURIZATION

  • Design calculations at national and international standards are checked.

  • It is applied at the stair pressurization place in accordance with the design.

  • Air flow and pressure difference values are monitored so as to create an effective flow area.

BUILDING PRESSURIZATION

  • It is checked that elevator and building critical areas are aware of pressure at maximum values.

  • The effect of open, closed and automatic doors is taken into account.

incoma commissioning tad cx devreye alma işletmeye alma

COMMISSIONING

incoma commissioning tad cx devreye alma işletmeye alma

CONSULTANCY

incoma commissioning tad cx devreye alma işletmeye alma

MANAGEMENT

incoma commissioning tad cx devreye alma işletmeye alma

ENERGY

incoma commissioning tad cx devreye alma işletmeye alma

SUSTAINABILITY

incoma commissioning tad cx devreye alma işletmeye alma

+90 322 999 32 11

+90 533 199 83 73

info@incoma.com.tr

ADANA

Head Office

Doseme Mh. 60075 Sok. Panora Plaza
K:6 D:41 01060 Seyhan, Adana/ Turkey

ISTANBUL

Istanbul Office

Guzeltepe Mah. 15 Temmuz Sehitleri Cad.
5. Levent Konutlari Eyup, Istanbul / Turkey

BODRUM

Bodrum Office

Yalikavak Mah. Flipper Sok.
Gokcebel Mevkii Bodrum, Mugla / Turkey

FOLLOW US ON SOCIAL MEDIA

© Copyright 2013 - | Incoma Engineering & Consultancy LTD. | All Rights Reserved. | Design by Medya Fabrikası Craetive Works